It’s been awhile since I’ve reported since not much obvious work has been going on except for 2 to 4 men most days working on this one radial sidewalk from the central kiosk to the northeast corner of the park since January. It has taken much of 5 months with 7 more sidewalks to go, it may be awhile before the renovation is complete! 🙂
At least I’ve learned that the sidewalks will be concrete rather than the old brick sidewalks, which at first was disappointing for the historical look, but they are definitely going for a modern look and concrete will also be more practical and cost less I would imagine and the younger generations everywhere definitely prefer modern. There is a trough down the center of the sidewalk which will probably be used to hide electrical wires, since the storm drain is a bigger pipe already buried under all this.
I like the two half circles off this walk with built-in seating for groups to assemble or people in general to visit. And not only are there built-in seats in the circle, but all the sidewalk walls are at sitting level, meaning there will be a lot more seating than the old park benches have provided. And that fits the purpose of bringing people together and the new modern look of the park too! I like it! When finished, the Central Park will really be the center of life in Atenas!
“Parks and playgrounds are the soul of a city.”
―
The Architect Plans Facebook Page has been taken down or the old link doesn’t work now. Sorry.
See my Central Park Renovation Photo Gallery with chronological photos of the progress.
¡Pura Vida!